Intermediate Storage of spent nuclear fuel from Nuclear Power Plant in Temelin

country / locationCzech Republic / Temelin
clientČEZ a.s.
construction period03/2009 – 06/2010
role of PSGCivil and technological Works

Brief description of the project

The object of an Intermediate Storage of spent nuclear fuel has been designed as the reinforced concrete monolithic structure, which is divided into two main parts. The reception section and the storage section, where the spent nuclear fuel is being stored in a special hermetically sealed containers before its transport to the final storage location. PSG’s scope of Works included the entire storage facility of 5250m2 and 120000m3, including the M&E services and transportation infrastructure connecting the facility to the Nuclear Power Plant in Temelin.

OTHER PHOTOGRAPHY

Intermediate Storage of spent nuclear fuel from Nuclear Power Plant in Temelin Intermediate Storage of spent nuclear fuel from Nuclear Power Plant in Temelin Intermediate Storage of spent nuclear fuel from Nuclear Power Plant in Temelin

Copyright © 2007-2012, PSG group Design and implementation ESMEDIA a.s.