Construction of Quality Control Terminal Building

country / location Russian Federation / St.Petersburg
client Hyundai Motor Manufacturing RUS
construction period 10/2009 - 07/2010
role of PSG General Contractor

Brief description of the project

Construction of one-storey service hall with two-storey inbuilt facility for administrative and storage purposes. The whole building is founded on piles, its carcass is made of prefabricated columns and steel roof structure. The roof is flat with PVC hydro isolation, covered with sandwich panels. A reinforced-concrete dumb well is copying the whole length of the hall (155m). The industrial flooring is covered with final epoxy coating.

OTHER PHOTOGRAPHY


Copyright © 2007-2012, PSG group Design and implementation ESMEDIA Interactive s.r.o