Production hall FORSCHNER

country / location Czech Republic/Napajedla
client Forschner Immo s.r.o.
construction period 06/2016 - 11/2016
role of PSG

Brief description of the project

It is a one floor production hall for metalworking with two floor administrative part. The built-up area is 4.956 m2. The bearing structure is made by pre-cast skeleton, the roof consists of trapezodial plate, vapour protection, heat insulation and elastomeric sheet. The roof is equipped with skylights which also enable airing the hall.

OTHER PHOTOGRAPHY


Copyright © 2007-2012, PSG group Design and implementation ESMEDIA Interactive s.r.o